Premium Stainless Steel Casting Parts for Automotive Intake and Exhaust System

Customization: Available
Casting Method: Directional Crystallization
Process: Lost Wax Casting

Product Description

Basic Information
Model NO.SIEG-017
Molding TechnicsGravity Casting
ApplicationAuto Parts
MaterialStainless Steel
Surface PreparationPolishing
Surface RoughnessRa0.8
Machining Tolerance+/-0.10mm
StandardAISI
CertificationCE, ISO 9001:2000
Lead Time35 Days
Transport PackageCarton Box+Pallet
SpecificationCustomized
Production Capacity10000pieces/Month
Product Description
Investment casting production process:

Investment casting is one of the manufacturing processes with a long history, can create parts with complex geometry and complex details. This investment casting process is beneficial to casting metal with high melting point temperature which can't be molded by gypsum or metal. Investment casting is popular because very intricate shapes with high accuracy can be made in this process.

Our Advantages
  • More professional investment casting team from China investment casting industry
  • Enough experience from hundred thousand types of investment casting to diversified industry application
  • National and province laboratory for the material and melting technology research
  • Complete inspection equipment and well-trained staff
  • Combination ability from the gravity and vacuum casting technology
  • 3D printing and process simulation program for the prototype
Frequently Asked Questions
Q1: What size products can you produce? A: We can produce a wide range of sizes for different industries, with no limit on weight.
Q2: What materials can you cast? Can I OEM logo on the product? A: We work with a variety of materials, including stainless steel, carbon steel, copper, alloy steel and more. We can assist in material selection based on your specific requirements. Yes we can OEM logo.
Q3: What surface finish can be produced? A: Ra3.2, and the machining finish can reach about Ra0.4. Other surface treatments can be done from electrophoresis, blackening, polishing, galvanizing to chrome plating, etc.
Q4: How to get sample? A: Sample is acceptable. Please tell us what product you need.
Q5: What's your payment policy? A: Generally, 30% deposit T/T before production, 70% balance before shipment.
Q6: How long is your delivery time? A: Sample delivery time is generally 25 days after the completion of the mold, mass production is not necessarily based on the quantity requirements, generally 30-40 days.

Related Products