Powder Metallurgy Adjuster Parts for Sintering Steering System

Still deciding? Get samples of $ !
Order Sample

Product Description

📊 Basic Info.
Model NO.
ZKAB01
Type
Steering Gears/Shaft
Material
Steel
Certification
ISO, AISI, DIN, CE, GB
Automatic
Automatic
Standard
Nonstandard
Condition
New
Process
Powder Metallurgy
Capacity
50000 Pieces/Day
HS Code
8479909090
📦 Packaging & Delivery
Package Size
22.00cm * 22.00cm * 22.00cm
Gross Weight
10.000kg
📝 Product Description
Powder Metallurgy Adjuster Parts

Excellent powder metallurgy parts metallic sintered parts

We could offer various powder metallurgy parts including iron based and copper based with top quality and cheapest price, please only send the drawing or sample to us, we will according to customer's requirement to make it.

💡 How do We Work with Our Clients

For design experts: We prefer to receive a fully RFQ pack including drawing, 3D model, quantity, and pictures.
For start-ups: Just send an idea you want to try; no deep engineering knowledge is required to begin.
Rapid Response: Sales reply within 24 hours; technical quotes provided within 1-3 working days.
Technical Support: Communication meetings with engineers can be arranged anytime.
Sintering Steering System
TypePowder metallurgy sintering
MaterialIron, stainless, steel, copper
Material standardMPIF 35, DIN 30910, JIS Z 2550
ApplicationHome appliances, Lockset, Electric tools, Automobile
ProcessingPowder Metallurgy, CNC Machining
Quality Control100% inspection
Part Image 1
Part Image 2
Part Image 3
Part Image 4
Part Image 5
Part Image 6
⭐ The Advantage of Powder Metallurgy Process
1. Cost effective
Reduces material waste and shortens machining time significantly.
2. Complex shapes
Obtain intricate geometries like gears and splines directly from tooling.
3. High precision
Achievable tolerances of IT 8-9 (sintered) or IT 5-7 (after sizing).
4. Self-lubrication
Interconnected porosity allows for oil impregnation for lifetime lubrication.
Technical Drawing
Process Chart
Frequently Asked Questions (FAQ)
Q1: What is the typical lead time for production? Generally, it takes 25 to 35 days after advance payment. For non-standard items, an extra 10-15 days may be required for tooling and mold creation.
Q2: How do you ensure the high quality of the parts? We perform 100% inspection using Carl Zeiss high-precision testing equipment for size, appearance, and pressure benchmarks.
Q3: Do you charge for tooling for every order? No, the tooling fee is a one-time charge on the first order. Future maintenance and repeat orders do not incur additional tooling costs.
Q4: Can you produce parts from specific drawings or samples? Yes, we specialize in producing parts based on your technical drawings or physical samples, including building custom molds.
Q5: What is the sample policy? We can provide samples if we have parts in stock; however, customers are responsible for the sample and courier costs.
Q6: What are the primary payment terms? Usually, a 50% prepayment is required, with the remaining balance due before shipment.

Related Products