Powder Metallurgy CNC Machinery Auto Car Motorcycle Oil Pump Electrical Tools Textile Diesel Engine Gearbox Reducer Transmission Parts Planetary Spur Gear

Still deciding? Get samples of $ !
Order Sample

Product Description

Powder Metallurgy Parts
📋 Basic Specification
Model NO.
KZBA003
Condition
New
Certification
ISO9001, IATF16949
Standard
DIN, ASTM, GOST, GB, JIS, ANSI, BS
Material
Iron, Stainless, Steel, Copper
Process
Powder Metallurgy
Capacity
50000 Pieces/Day
HS Code
8479909090
⚙️ Product Description

Excellent Powder Metallurgy Metallic Sintered Parts

We offer various powder metallurgy parts including iron-based and copper-based components with top quality. By utilizing advanced sintering techniques, we can manufacture complex shapes according to drawings or samples provided by clients.

🛠️ How We Work with Clients

1
Professional Teams: Send us fully RFQ packs including 3D models and quantities.
2
Start-up Ideas: Just share your concept; we handle the engineering and casting details.
3
Fast Response: Confirmations within 24 hours and quotes within 1-3 working days.
4
Technical Support: Meetings with our engineers are available anytime if required.
Sintering Process Part Showcase 1 Part Showcase 2
Part Showcase 3 Part Showcase 4 Part Showcase 5
🌟 The Advantage of Powder Metallurgy
  • 1. Cost Effective: No need for extensive machining, saving material and reducing production costs.
  • 2. Complex Shapes: Obtain directly from compacting tooling (teeth, splines, profiles) without extra operations.
  • 3. High Precision: Typical tolerances of IT 8-9, improvable down to IT 5-7 after sizing.
  • 4. Self-lubrication: Interconnected porosity can be filled with oil for self-lubricating bearings.
  • 5. Green Technology: Certified ecological process with low waste and recyclable products.
Quality Control
❓ Frequently Asked Questions
Q1: How do you guarantee the quality?
We perform 100% inspection using Carl Zeiss high-precision testing equipment for every product's size and appearance.
Q2: What is the typical delivery time?
Generally 25 to 35 days. For non-standard items, an extra 10-15 days may be required for tooling and mold creation.
Q3: Can you produce based on samples or drawings?
Yes, we can produce directly from your technical drawings (2D/3D) or physical samples, including building necessary molds.
Q4: How does the tooling charge work?
The tooling charge is a one-time fee. Future orders will not be charged for tooling, even during maintenance or repair.
Q5: What is your sample policy?
We can supply samples if parts are in stock; however, customers are responsible for the sample and courier costs.
Technical Drawing Info

Related Products