High Quality Powder Metallurgy Customized Forged Automobile Parts for Steering System Parts

Still deciding? Get samples of $ !
Order Sample

Product Description

📊 Basic Specifications
Model NO.
ZKAB01
Type
Steering Gears/Shaft
Material
Steel
Certification
ISO, AISI, DIN, CE, GB
Process
Powder Metallurgy
Condition
New
Daily Capacity
50000 Pieces/Day
HS Code
8479909090
Powder Metallurgy Customized Forged Automobile Parts
⚙️ Product Overview

Excellent powder metallurgy parts metallic sintered parts.

We offer various high-quality iron-based and copper-based powder metallurgy parts. Products are manufactured according to customer drawings or samples to ensure they meet exact requirements.

🛠️ How We Work with Our Clients

01Send us a full RFQ pack (drawings, 3D models, quantity) or just an initial idea.
02Sales team responds within 24 hours to confirm details.
03Engineering team provides an official offer within 1-3 working days.
04Technical communication meetings can be arranged anytime with engineers.
TypePowder metallurgy sintering
Machinery Test reportProvided
MaterialIron, stainless, steel, copper
Material StandardMPIF 35, DIN 30910, JIS Z 2550
ApplicationSmall home appliances, Lockset, Electric tool, Automobile
Quality Control100% inspection
Powder MetallurgyHigh frequency quenching, oil immersion
Production line
💎 Advantages of Powder Metallurgy

1. Cost effective: Reduces machining time and material waste.

2. Complex shapes: Allows for direct creation of intricate geometries (teeth, splines, profiles).

3. High precision: Achieves IT 8-9 tolerances as sintered, and up to IT 5-7 after sizing.

4. Self-lubrication: Interconnected porosity allows for oil filling, eliminating the need for external lubricants.

5. Green technology: Eco-friendly process with low material waste and high energy efficiency.

Technical Chart
❓ Frequently Asked Questions
Q: How do you guarantee product quality?
We perform 100% inspection using Carl Zeiss high-precision testing equipment to ensure size, appearance, and pressure tests are perfect.
Q: What is the typical delivery time?
Generally 25 to 35 days after advance payment. Non-standard items may require an additional 10-15 days for tooling production.
Q: Can you produce from specific samples or drawings?
Yes, we can manufacture based on your technical drawings or physical samples and build necessary molds and fixtures.
Q: How are tooling charges handled?
Tooling is charged only once on the first order. All future orders do not incur tooling fees, even for repairs or maintenance.
Q: What is your payment policy?
Usually, a 50% prepayment is required, with the remaining balance settled before shipment.
Q: How do you maintain long-term business relationships?
We prioritize customer benefits via high quality and competitive pricing, treating every client with sincerity and respect.

Related Products